The Sutlej River Basin is the major part of Indus River Basin. It is the easternmost tributary of the Indus River. It rises near the Darma Pass near Mansarovar Lake, enters the Zarkar range and flows through Tibet before entering India. It cuts through the Great Himalayan range and the outer Himalayas and enters the plains at Roper. It receives the Beas River at Harike at Punjab and forms the boundary between India and Pakistan for nearly 120 km. It finally enters Pakistan near Sulemanki.
The project wise generation data of large hydro (above 25 MW) with installed capacity of the basin in the latest year 2012-13 is follows.
SN | Projects |
State |
Inst Capacity (MW) |
Generation (MU) |
MU/MW |
1 | Sanjay Bhabha |
Himachal Pradesh |
120 |
365 |
3.04 |
2 | Baspa-II |
Himachal Pradesh |
300 |
1240 |
4.13 |
3 | Nathpa Jhakri |
Himachal Pradesh |
1500 |
6778 |
4.52 |
4 | Bhakra |
Himachal Pradesh |
1325 |
4707 |
3.55 |
5 | Ganguwal |
Punjab |
77.65 |
593 |
7.64 |
6 | Kotla |
Punjab |
77.65 |
600 |
7.73 |
7 | AP Sahib |
Punjab |
134 |
639 |
4.77 |
8 | Karchham Wangtoo* |
Himachal Pradesh |
1000 |
4057 |
4.6 |
Total |
– |
4534.3 |
18979 |
4.19 |
* The Generation figure of Karchham Wangtoo is available for one year only as it commissioned in the year 2011.
Image may be NSFW.
Clik here to view.
- The above graph shows the trend line of power generation of large Hydropower projects for last 28 years in the Sutlej basin. The trend-line shows diminishing generation from existing hydro power projects of Sutlej River Basin.
- It shows that the per MW generation in 2012-13 (4.19) has dropped by a huge 31.09% from the highest per MW generation (6.08) achieved in the year 1998-99.
- All generation figures have been taken from official data of Central Electricity Authority (CEA).
Clik here to view.

1000 MW KarchamWangtoo HEP
Clik here to view.

Muck dumped from Karcham Wangtoo project into the Sutlej photo from :http://adrianomarzi.photoshelter.com/
List of other projects (up to 25 MW) under operation (for which latest generation figures not available):
SN | Project |
Ins Cap (MW) |
State |
1 | Rukti |
1.50 |
Himachal Pradesh |
2 | Chaba |
1.75 |
Himachal Pradesh |
3 | Rongtong |
2.00 |
Himachal Pradesh |
4 | Nogli |
2.50 |
Himachal Pradesh |
5 | Titang |
0.90 |
Himachal Pradesh |
6 | Lingti |
0.40 |
Himachal Pradesh |
11 | Ghanvi |
22.50 |
Himachal Pradesh |
Total |
31.55 |
Source: http://www.hpseb.com/hydro_potential.htm
List of proposed and under construction projects in the basin:
Project |
Ins Cap (MW) |
State |
Status |
|
1 | Kol Dam |
800 |
Himachal Pradesh | Under Construction |
2 | Rampur |
412 |
Himachal Pradesh | Under Construction |
3 | Kashang-I |
165 |
Himachal Pradesh | Under Construction |
4 | Kasang-IV |
48 |
Himachal Pradesh | Under Construction |
5 | Shorang |
100 |
Himachal Pradesh | Under Construction |
6 | Raura |
8 |
Himachal Pradesh | Under Construction |
7 | Ghanvi-II |
10 |
Himachal Pradesh | Under Construction |
8 | Bhaba Aug.PH |
4.5 |
Himachal Pradesh | Under Construction |
9 | Chango-Yangthang HEP |
180 |
Himachal Pradesh | EAC TOR Approved |
10 | Lara Sumta |
104 |
Himachal Pradesh | EAC TOR Approved |
11 | Luhri HEP |
775 |
Himachal Pradesh | EAC & FAC Recommended |
12 | Shongtong-Karcham HEP |
402 |
Himachal Pradesh | EAC& FAC Recommended, (Under stay order of HC) |
13 | Sumta Kathang |
130 |
Himachal Pradesh | EAC TOR Approved |
14 | Tidong -I |
100 |
Himachal Pradesh | EAC Recommended |
15 | Tidong -II |
60 |
Himachal Pradesh | EAC Under consideration |
16 | Yangthang – Khab HEP |
261 |
Himachal Pradesh | EAC TOR Approved |
17 | Kashang -Stage II & III HEP |
130 |
Himachal Pradesh | FAC Recommended |
18 | Jangi Thopan |
480 |
Himachal Pradesh | Proposed |
19 | Khab-I |
450 |
Himachal Pradesh | Proposed |
20 | Khab-II |
186 |
Himachal Pradesh | Proposed |
21 | Kuling Lara |
40 |
Himachal Pradesh | Proposed |
22 | Kut |
24 |
Himachal Pradesh | Proposed |
23 | Mane Nadang |
70 |
Himachal Pradesh | Proposed |
24 | Poo Spiloo |
300 |
Himachal Pradesh | Proposed |
25 | Ropa |
60 |
Himachal Pradesh | Proposed |
26 | Thopan Powari |
480 |
Himachal Pradesh | Proposed |
27 | Bahairari |
5.5 |
Himachal Pradesh | Proposed |
28 | Lara |
60 |
Himachal Pradesh | Proposed |
29 | Baspa |
210 |
Himachal Pradesh | Proposed |
Total |
6055 |
– |
– |
EAC: Expert Appraisal Committee of MoEF; FAC: Forest Advisory Committee of MoEF
Source: http://www.hpseb.com/hydro_potential.htm; http://envfor.nic.in
Clik here to view.

Underground Tunnel at Nathpa Jhakri Project
Clik here to view.

1500 MW Nathpa Jhakri Project
Map of Hydroelectric Projects in Sutlej River Basin available at:
http://sandrp.in/basin_maps/Hydropower_Projects_in_%20Sutlej_River_Basin.pdf
South Asia Network on Dams, Rivers & People (www.sandrp.in) July 2013
Image may be NSFW.
Clik here to view.
Clik here to view.